Sign In | Join Free | My disneypov.com
disneypov.com
Sinoma (Yichang) Energy Conservation New Material Co., Ltd.
Respect, Sincerity and Integrity, Harmony and Efficiency
Home > AAC Block Production Line >

High Efficiency Fly Ash AAC Block Production Line Automatic Energy Saving

Sinoma (Yichang) Energy Conservation New Material Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Sinoma (Yichang) Energy Conservation New Material Co., Ltd.
Province/State: Hubei
Country/Region: China
Tel: 86-717-3280868
Contact Person:
Mr Jason Shao

High Efficiency Fly Ash AAC Block Production Line Automatic Energy Saving

Brand Name : SINOMA/ CNBM
Model Number : SINOMA-AAC
Certification : ISO, CE
Place of Origin : Wuhan, Hubei
MOQ : 1 Production Line
Price : 1000000 USD
Supply Ability : 5 Lines Per Year
Delivery Time : 3 Months
Packaging Details : Steel Frame In Container
Automatic : Yes
Brick Raw Mate : Cement, Lime, Sand,fly ash,Gypsum etc.
Capacity : 50000-300000m3
Voltage : 380 V or customized
Worker : 11-16 person
Package : Bare in container
Contact Now

CE Certification Fly Ash AAC Block Production Line And Price


Aerated Concrete Block is a new environmental production in worldwide market, widely used in public facilities, industrial construction, civil housing, hotel, schools, stores, supermarkets as
external wall, fence, etc. It is more and more polular all over the world for its light weight, good sound instruction, heat preservation, easy machining (cut, screwed. drilled) and quckily installed.It will replace traditional block in very near future.


Production Process
(1) Preparing Material.
Matching raw materials and put them into mixer, mix them even with water
(2) Moulding
Pour the mixture into mould and pre-curing the mixture under certain temperature until the
mixture has certain hardness.
(3) Forming Blank
a. Turn the solid with mould
b. Unload the mould but mould bottom remained.(then the mould turns back)
c. Cut the solid into blank
(4) Hardening Blank to End Product
a. Hang the blank and bottom onto the hardening car by semi-production hanger.
b. Pull the hardening car into autoclave and harden the blank to brick under high temperature.
(5) Packing
a. Hang the end products to be stacked or loaded and packed.
b. The mould bottom returned and re-from with the mould (in step (3)) preparing for next
circulation.


Product Tags:

aac block manufacturing plant

      

aac bricks making machine

      
China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

High Efficiency Fly Ash AAC Block Production Line Automatic Energy Saving Images

Inquiry Cart 0
Send your message to this supplier
 
From:
Enter your email please.
To: Sinoma (Yichang) Energy Conservation New Material Co., Ltd.
Subject:
Message:
Characters Remaining: (0/3000)